I was able to implement the new design on the copper rail that will work better than the previous design. The previous design will result in making a lot of noise and damage to the collector shoes and rails. This new design will have a diagonal cut on the copper, which will make a better fit. There will also be a copper rail behind the connection point that will make the connection more sturdy.
Subscribe to:
Post Comments (Atom)
Week 8
This week is to finish the rails. The rails are done at this point, but only testing is needed. I would also start on the final report for t...
-
This week is to finish the rails. The rails are done at this point, but only testing is needed. I would also start on the final report for t...
-
I found many mistakes the previous team had done. I have questions about the batteries and charge controller with the railing designs. The m...
-
The first week of the Spartan Superway internship was exciting and interesting. My part of the internship deals with Half-Scaled Wayside. I ...